| LREV |
1 |
BCD*10.0 |
Line Revision |
E A K R |
|
| CONTRACT |
2 |
String*16 |
Contract |
A |
Mask: %-16C |
| PROJECT |
3 |
String*16 |
Project |
A |
Mask: %-16N |
| CCATEGORY |
4 |
String*16 |
(Cost) Category |
A |
Mask: %-16N |
| COSTCLASS |
5 |
Integer |
Cost Class |
A |
List:7 entries
| 0 |
= |
|
| 1 |
= |
Labor |
| 2 |
= |
Material |
| 3 |
= |
Equipment |
| 4 |
= |
Subcontractor |
| 5 |
= |
Overhead |
| 6 |
= |
Miscellaneous |
|
| ITEMNO |
6 |
String*24 |
Item Number |
A P |
Mask: %-24C |
| ITEMDESC |
7 |
String*60 |
Item Description |
A |
|
| AMOUNT |
8 |
BCD*10.3 |
Amount |
E A X |
|
| BILLTYPE |
9 |
Integer |
Billing Type |
A P |
List:4 entries
| 0 |
= |
|
| 1 |
= |
Non-billable |
| 2 |
= |
Billable |
| 3 |
= |
No Charge |
|
| BILLRATE |
10 |
BCD*10.6 |
Billing Rate |
E A X |
|
| BILLCURR |
11 |
String*3 |
Billing Currency |
A |
Mask: %-3N |
| ARITEMNO |
12 |
String*16 |
A/R Item Number |
A |
Mask: %-16C |
| ARUNIT |
13 |
String*10 |
A/R Unit of Measure |
A |
Mask: %-10C |
| PROJTYPE |
14 |
Integer |
Project Type |
A |
List:4 entries
| 0 |
= |
|
| 1 |
= |
Time and Materials |
| 2 |
= |
Fixed Price |
| 3 |
= |
Cost Plus |
|
| REVREC |
15 |
Integer |
Accounting Method |
A |
List:9 entries
| 0 |
= |
|
| 1 |
= |
Completed Project |
| 2 |
= |
Total Cost Percentage Complete |
| 3 |
= |
Labor Hours Percentage Complete |
| 4 |
= |
Billings and Costs |
| 5 |
= |
Project Percentage Complete |
| 6 |
= |
Category Percentage Complete |
| 7 |
= |
Completed Contract |
| 8 |
= |
Accrual-Basis |
|
|